Water proofing for slab a d damp proof coarse

Waterproofing and damp proof coarse for slab and basement level



Hi every one today we are going to discuss about the damp proof and leakage proof coarse method for the house slab as you can see the images as given below let us see here and check it out as below
Hi everyone one today I going to say you some useful tips related to the waterproofing 

  1. Topics covered in this blog
  2. Time required for water proofing 
  3. Benifuts of it
  4. Used for what purpose 
  5. How many days neded for waterproofing 
  6. Chemicals used for water proofing
  7. Tools used for water proofing      

  1. First day process
As here the first day you need to clean the slab completely and make the cleaner with the vacuum pamp and the chisel  

Remove the loose particles what ever left on the slab and make it clean for better grip 

Make the surface rough for better attachment on the slab for the good grip and may be very helpful for your purpose as can see it here in the video and the images


 As in the image you can see here the 1st day the labour is cleaning the slab clearly and making it very clean and removing the loose particle with the help of wire brush.
As you can get the wire brush in the hardware shop and the cost is around 30 rupees to 100 rupees depend on the quality of the brush as you can see it here and now the surface been cleaned
 And removed all the dust particles
As the lighter smaller dust particles been removed with the help of the vacuum cleaner which you may get in the shops and the and can buy in the shops or online also as it cost you around 3000 rupees to 5000 rupees and now the surface been cleaned fully

Filling of cracks


Using the mechanic cutter the crack been increased and made it more rough so that it can be cleaned very well with the help of the cutter and then where ever if you need there you can cut it properly so that it may going to be the best and the idea one as you can see it here and then now 
 The surface been made rough after cleaning the 2nd day process been started and the second day procedure is been as below let use discuss about it as you could see here

2nd day procedure 

In the second day make the surface moist so that all the finer particles get cleaned and wiped out so that it could not get affected by any ways as you can see here and now let us see the other way as you can check it out here 
 As the water been poured on the slab so that to make the slab moist and the size of the slab is 400 square feet and it looks cool as you can see it here and then now the clean the surface and allow it to dry
 As the person and the labour been cleaning the surface to make it in a better way as you can see it here
Water been sprinkling over the slab
 After this method is completed the next method is adding chemicals the slab and the procedure been started the chemical used here is the redwood water proofing and the type are as below the cost of the chemicals are also in the following manner and can be done as below as earlier

Application of chemical 


As the branded water proofing chemical been added here and the brand name is redwoop chemical as the product been applied over here and mixed properly in the 20 litre bucket so that to make the chemical fully clean and in a better way so as to keep it moist in the following way as you can see it here 

 Chemical mixing procedure and first coat details 

In the first coat the chemical been used in the ratio of 1 by 1 that is per one litre 1 litre water been used in the same quantity and that been mixed with the other agent as I will show you in the image below 
 The chemical bee spreaded over and the residue of the hard left behind been filled in the joints and then applied over the crack part of the roof so that the water could not get leakage over here and hence the method applied over here as you can see there the applying method as below and now the next procedure starts

Happy the 1st Capt fully

As the first coat been applied fully over the surface and making them I'm a better way as above and the water and chemical mixture been applied fully ove the slab and allowed it to dry for 1 day or 12 hours as needed
 Same one image you can see here as the 1st coat been applying here over the moist content and you can see over here as the below
 Around  1 box needed for application of the 400 square feet area as the area been speeded over the slab and the work tooks you one day and the following procedure as you can see over here as in the given below

Liquid along with the cement 



The chemical used here is the redwoop and the cost of this cement bag is 1200 and liquid costs you around 800 and total 2000 but you need around 4 box 

 First coat application completed 

As in the image you can see it here the first coat application been completed and the rest been allowed it to get cool and allowed it to dry for one day and this the 2nd day been completed as you can see it here as above and then now let use see the following way as possible and it should be added as above 

 Here you can see it the full produce what will happen upto the first day as above and the 2nd day now we will talk about the 3rd day of the waterproofing application method

3rd day application procedure 

As in the image the company person has came for the 3rd day application and it looks to be cool as you can see over here and the procedure begins as above let use it 
 Now the chemical been mixed without ant water so the second coat of the chemical application been starting and is done in the following way as below so now let us see about it as you can see it here as the procedure begins as above
 Spread the chemical completely all over the slab and allow it to with the help of the wiper and make it more stiff and beautiful so that it could be reached very well as you can see it here and is been used in the following way as you can see it here


The chemical been applied over the slab so that making it more better
First the corner side been applied with the paint brush so that making it more perfect as you can see it here as above and making the corner all four side firt applied and then 3 inch above been took over here as you can see it here so now let us see it here
 Spread the chemical or pour on the slab so that making it more better way as you can see it here as the chemical been spresded with the help of the wiper and make it more workable way as you can see it here and the next step of the chemical is as above so that making it more better way as usual
 Same procedure been applied over the slab and it been applied
The cost is 2100 and per square feet this costs you around 25 per square feet with included material as you can see it here and the next step is as above
 As the chemical been applied over the slab
 Spread the chemical properly on the crack joints and allow it to dry well so the it should get completely filled properly in the given way as you can see it here

 The second coat been applied over it and allowed it for 3 hours and keep dry so that it been utilised in the following way as you can see it here
 The coat been applied completed and this been allowed to dry for 3 to 4 hours and keep it in a better way as you can see it here and now the other procedure takes place in the following way as you applied for it

Application of final coat

The final coat been applied over here as you can see it here 
The final coat the separated white colour redwoop been applied here and the chemical been used as in the following way as the white 1st coat been applied
 Same way it been applied and completed as the roller can be used for application if this caot
 Now this been applied fully



 As the superior caot been used as the chemical and little water been applied over here so that it can be applied over the slab so that it can be applied over here as you can see it here in the image and now let use see few more design ideas how it looks and how great it is
 After 30 minutes apply the second caot ofvthe whitener and allow it to make in the following way as you can see it here and the next final coat been applied as you can see it here in the video and now the other procedure been applied over here


 The cost details can be seen as the cost is 800 to 1200

Few more details you can see in the video as above and this is the full procedure for the application of the redwoop chemical over the slab to make it water proofing for more details you can comment over here how you felt about this and please follow and like my channel also so that it going to be help you a lot thank
Water proofing for slab a d damp proof coarse Water proofing for slab a d damp proof coarse Reviewed by Awesome House Plans on June 17, 2019 Rating: 5